## Abstract

A monthly electricity bill states total energy, which is insufficient for sizing a solar and storage system: the result depends on when energy is used, on peak demand and on which loads must continue through an outage. This paper sets out a first-estimate method that starts from a logged load profile. The battery is sized from the critical load and the required autonomy; the array from daytime consumption plus battery recharge, using site irradiance [2] and a performance ratio as defined in IEC 61724-1 [1]; and the inverter from the larger of three conditions. The method is worked for a small office and its sensitivity to irradiance and performance ratio is shown. It is the method implemented in Logicode's solar and battery calculator and is intended to precede, not replace, a detailed design.

## In brief

Don't size solar from the electricity bill. Measure when the power is used and which things must stay on in a power cut, then size panels, batteries and inverter together from that. Then keep watching it, because solar systems fail quietly.

## Key findings

1. Battery capacity follows from the critical load and the required autonomy: 2.5 kW for 6 hours is 15 kWh usable, or 17.6 kWh nominal at 85% usable depth (Eq. (1)).
2. Daily yield per installed kilowatt-peak is peak sun hours multiplied by performance ratio: 5.2 × 0.78 = 4.06 kWh (Eq. (2)).
3. An office using 45 kWh a day, 67% of it in daylight, needs about 11.1 kWp to cover daytime use and recharge that battery (Eq. (3)).
4. Across 3.5 to 6.5 peak sun hours the same site needs between 8.9 and 16.5 kWp, so local irradiance data is not optional (Fig. 1).

## 1 Why the load profile, not the bill

A bill gives energy consumed over a month. Sizing requires three things it does not show: the distribution of consumption through the day, the highest demand at any moment, and the loads that must survive an outage. A clinic using 600 kWh a month between 8 am and 5 pm requires a different system from a cold store using the same 600 kWh around the clock.

The profile is obtained by fitting a logging meter to the incoming supply, and where practical to the principal sub-circuits, for at least seven days covering a working week and a weekend. The log yields the daily load curve, the peak demand and the overnight base load. Loads are then classified as critical (must continue: servers, refrigeration, security, selected lighting), preferred, and deferrable until the grid returns (typically air conditioning, water heating and large motors).

## 2 Sizing method

### 2.1 Battery

    E_{nom} = frac{P_{crit} × t_{aut}}{DoD}        (1)
where E_nom is the nominal battery capacity in kWh, P_crit the critical load in kW, t_aut the required autonomy in hours and DoD the usable depth of discharge.

The numerator is the usable energy required. Dividing by the usable depth gives the nameplate capacity to be purchased; the calculator uses 0.85 for lithium iron phosphate, and the value for a particular product is taken from its datasheet.

### 2.2 Array

    Y = H × PR        (2)
where Y is the daily energy yield in kWh per kWp installed, H the peak sun hours for the site and PR the performance ratio.

    P_{array} = frac{E_{day} + E_{use}}{Y}        (3)
where P_array is the array rating in kWp, E_day the energy consumed during daylight and E_use the usable battery energy to be replaced each day, both in kWh.

Peak sun hours are numerically equal to daily irradiation in kWh/m² and are taken from a solar resource dataset for the site's coordinates, such as the Global Solar Atlas published by the World Bank Group [2], for the plane of the array and for the least favourable month if supply must be maintained all year. The performance ratio is the ratio of the energy a system delivers to the energy its rated power would deliver at the measured irradiation; IEC 61724-1 defines it and the monitoring needed to measure it [1]. Before a system exists it is an assumption covering temperature, soiling, wiring and conversion losses; models such as PVWatts estimate these loss components individually [3].

### 2.3 Inverter

The inverter rating is the smallest standard size that satisfies three conditions:

- the critical load with 25% headroom;
- the starting surge of the largest motor on the backed-up circuits, taken against the inverter's short-term overload rating (the calculator assumes a start of three times running power and an overload capability of twice the rating);
- the array's output, at a ratio of array rating to inverter rating of 1.2.

The motor-start multiple and the overload capability are assumptions. For a design they are replaced by the motor's starting data and the inverter manufacturer's overload curve.

## 3 Worked example

A small office has a logged consumption of 45 kWh a day, of which 67% falls in daylight hours. Its critical load is 2.5 kW, including a 1.5 kW pump, and must be carried for 6 hours. The site receives 5.2 peak sun hours and a performance ratio of 0.78 is assumed.

**Table 1.** Worked example, calculated with Eq. (1), Eq. (2) and Eq. (3).

| Quantity | Calculation | Result |
| --- | --- | --- |
| Usable battery energy | 2.5 kW × 6 h | 15 kWh |
| Nominal battery capacity | 15 kWh ÷ 0.85 | 17.6 kWh |
| Daily yield | 5.2 h × 0.78 | 4.06 kWh per kWp |
| Daytime consumption | 45 kWh × 0.67 | 30.2 kWh |
| Array rating | (30.2 + 15) kWh ÷ 4.06 | 11.1 kWp |
| Motor-start surge | 1 kW + 3 × 1.5 kW | 5.5 kW |
| Inverter requirement | largest of 3.13, 2.75 and 9.28 kW | 9.28 kW → 10 kW |

In this case the array, not the critical load, determines the inverter. Fig. 1 shows how strongly the array rating depends on the two site-specific inputs, and Fig. 2 how battery capacity scales with autonomy.

**Fig. 1.** Array rating required against peak sun hours, for three performance ratios. The required array falls as irradiance rises and as performance ratio improves; between 3.5 and 6.5 peak sun hours the requirement nearly halves. Calculated from Eq. (3) for the worked example.

| Peak sun hours (kWh/m² per day) | PR 0.7 | PR 0.78 | PR 0.85 |
| --- | --- | --- | --- |
| 3.5 | 18.4 | 16.5 | 15.2 |
| 4 | 16.1 | 14.5 | 13.3 |
| 4.5 | 14.3 | 12.9 | 11.8 |
| 5 | 12.9 | 11.6 | 10.6 |
| 5.5 | 11.7 | 10.5 | 9.66 |
| 6 | 10.8 | 9.65 | 8.85 |
| 6.5 | 9.92 | 8.91 | 8.17 |

**Fig. 2.** Nominal battery capacity against required autonomy. Battery capacity is proportional to autonomy: twelve hours requires six times the capacity of two hours. Calculated from Eq. (1) for a critical load of 2.5 kW at 85% usable depth.

| Autonomy (hours) | Capacity |
| --- | --- |
| 2 h | 5.88 |
| 4 h | 11.8 |
| 6 h | 17.6 |
| 8 h | 23.5 |
| 12 h | 35.3 |

## 4 Matters for detailed design

- Critical loads are placed on a separate distribution board so that the inverter supplies only them during an outage.
- Changeover time is checked against the equipment supplied; servers and network equipment are normally kept behind a small online UPS.
- Roof structure and shading are assessed over the whole year, not on a single visit.
- Cables are sized for voltage drop on long DC runs as well as for current.
- The battery location is ventilated, shaded and protected from water.

## 5 Monitoring and verification

Faults in a solar installation are frequently silent: a disconnected string, a soiled array or a battery that has lost capacity produces no alarm until the supply fails. The inverter, the battery and a main meter are therefore connected to remote monitoring, and the measured performance ratio is compared each month with the value assumed in the design [1]. This comparison is also the only evidence that the projected saving is being achieved.

## 6 Limitations

- The method uses daily energy balances. It does not simulate the system hour by hour and so does not capture consecutive overcast days or seasonal storage.
- The performance ratio, usable depth, motor-start multiple and array-to-inverter ratio are assumptions to be replaced with product and site data.
- Tariffs, export arrangements and financial return are outside the scope of this paper.

## References

[1] International Electrotechnical Commission, "Photovoltaic system performance – Part 1: Monitoring", IEC 61724-1:2021, Edition 2.0, 2021. https://webstore.iec.ch/publication/70170
[2] World Bank Group, ESMAP and Solargis, "Global Solar Atlas", Energy Sector Management Assistance Program, accessed November 2026. https://globalsolaratlas.info/
[3] A. P. Dobos, "PVWatts Version 5 Manual", Technical Report NREL/TP-6A20-62641, National Renewable Energy Laboratory, 2014. https://www.osti.gov/biblio/1158421

## Cite this paper

Logicode Engineering, "Sizing solar and batteries for a business that can't go dark", Logicode Technical Report LGC-TR-2026-04, version 2.0, 2026. https://logicode.solutions/insights/sizing-solar-and-batteries-for-a-business

```bibtex
@techreport{lgctr202604,
  author      = {{Logicode Engineering}},
  title       = {Sizing solar and batteries for a business that can't go dark},
  institution = {Logicode Solutions},
  number      = {LGC-TR-2026-04},
  year        = {2026},
  note        = {Version 2.0},
  url         = {https://logicode.solutions/insights/sizing-solar-and-batteries-for-a-business}
}
```